Since 2016, PT Perma Alir Indonesia has been familiar with Trenchless technology and
has started to introduce and obtain trenchless projects, especially the Cured In Place
Pipe Project, namely rehabilitating the Hydro Power Plant cooling water pipe at an
aluminum company owned by the PT INALUM and after that, every year in a row, it has
obtained the same job for 3 consecutive years in the same place.
In 2020 and 2023, PT Perma Alir again received similar work, namely rehabilitating
cooling water pipes at the Hydro Power Plant, but this time it belonged to a subsidiary
of PT PLN Persero, namely at the Cirata Hydroelectric Power Plant located in West
Java, Indonesia.
During the company’s journey over the past 10 years, many trenchless-related
technologies have been known or adopted by PT Perma Alir Indonesia, especially
Trenchless technology related to Cured In Placed Pipe / CIPP.
325
Revenue in 2017 (Million)
525
Collaegues & Counting
302
Successfully Project
25
Year of experience
The Team
Our Experts

Mike Rich
Lead Architect

Jenny Smith
Head Engineer (US)

George Doe
Head Engineer (CN)

Maria Jay
Head Engineer (AU)
Sustainability
Committed To Keep People Healthy & Safe
We Follow Best Practices
- Sustainablility
- Project On Time
- Modern Technology
- Latest Designs